Traffic hotline 080 80 15

18. Sep 2019 at 08:05 Kneža News

New hydro power plant opens

Vir: Rok Omahen

A small hydro power plant opened on the Kneža river yesterday.

The station is expected to produce as much as 3.3 gigawatt hours a year – that’s more than many large stations produce.

The high performance is thanks to a long underground pipeline, that harnesses the energy of a nearly 100 meter long drop.

The plant cost about 2.3 million euros.

M. M.